I.S. EN 61375-2-2:2012
Current
The latest, up-to-date edition.
ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-2: WIRE TRAIN BUS CONFORMANCE TESTING (IEC 61375-2-2:2012 (EQV))
Hardcopy , PDF
English
01-01-2012
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions, Abbreviations, Conventions
4 Conformance test: approach, requirements and boundaries
5 Conformance test of a WTB node, WTB trunk cable, WTB
jumper cables, WTB extension cables
6 Conformance test of RTP
7 Conformance test of a WTB-equipped consist
8 Conformance test of NM
Annex A (normative) - Test laboratory role and client role
Annex B (informative) - Test instrumentation and dedicated
test bed
Bibliography
Annex ZA (normative) - Normative references
to international publications with their
corresponding European publications
Annex ZZ (informative) - Coverage of Essential
Requirements of EU Directives
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.