CSA C445 : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
DESIGN AND INSTALLATION OF EARTH ENERGY HEAT PUMP SYSTEMS FOR RESIDENTIAL AND OTHER SMALL BUILDINGS
Hardcopy , PDF
02-01-2002
English
Technical Committee on the Installation of Ground and
Water Source Heat Pumps
Preface
1 Scope
2 Definitions
3 Reference Publications
4 General Requirements for Collector Systems
4.1 Contractor's Responsibilities
4.2 Equipment and Materials
4.3 Installation - General
5 Collector System Design and Application
5.1 All Systems
5.2 Closed Systems
5.3 Open Systems
6 Collector System Installation
6.1 General Requirements
6.2 Closed System Requirements
6.3 Open System Requirements
7 Collector System Testing and Verification Protocol
8 Instructions and Markings
9 General Requirements for Heat Pump, Circulation, and
Heat Distribution Equipment
10 Indoor System - General Contractor Requirements
11 Heat Pump System Design Principles
12 Heat Pump System Installation
13 Information Transfer
14 Warranty
Appendix A
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.