• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PD IEC/TS 62561-8:2018

Current

Current

The latest, up-to-date edition.

Lightning protection system components (LPSC) Requirements for components for isolated LPS

Published date

09-02-2018

Committee
GEL/81
DocumentType
Standard
PublisherName
British Standards Institution
Status
Current

This document specifies the requirements and tests for insulating stand-offs, used in conjunction with an air-termination system and down-conductors with the aim of maintaining the proper separation distance, and the requirements and tests for insulating down-conductors, including their specific fasteners, able to reduce the separation distance.

Testing of insulating stand-offs and insulating down-conductors components for an explosive atmosphere is not covered by this document.

Requirements and tests for other types of components for isolated LPS are under consideration.

Standards Relationship
IEC TS 62561-8:2018 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.