EN ISO/IEC 9646-5 : 1996
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
INFORMATION TECHNOLOGY - OPEN SYSTEMS INTERCONNECTION - CONFORMANCE TESTING METHODOLOGY AND FRAMEWORK - PART 5: REQUIREMENTS ON TEST LABORATORIES AND CLIENTS FOR THE CONFORMANCE ASSESSMENT PROCESS
23-07-2013
12-01-2013
Foreword
Introduction
1 Scope
2 Normative references
3 Definitions
4 Abbreviations
5 Overview of the conformance assessment process
5.1 Introduction
5.2 Preparation for testing
5.3 Test operations
5.4 Test report production
6 Preparation for testing
6.1 Introduction
6.2 Requirements for testability of the System
Under Test
6.3 Communication between the test laboratory and
the client
6.4 Documentation for conformance assessment
7 Test operations
7.1 Introduction
7.2 Static conformance review
7.3 Test selection
7.4 Test parameterization
7.5 Verification of Test Coordination Procedures
7.6 Test campaign
7.7 Negotiated exits during the test campaign
8 Test report production
8.1 Conformance test reports
8.2 System Conformance Test Report (SCTR)
8.3 Protocol Conformance Test Report (PCTR)
9 Compliance
9.1 Test laboratory role
9.2 Client role
Annex A (Normative) System Conformance Test Report
(SCTR) template
A.1 Introduction
A.2 Conformance
A.3 SCTR proforma
Annex B (Normative) Protocol conformance Test Report (PCTR) template
B.1 Introduction
B.2 Conformance
B.3 PCTR proforma
Annex C (Informative) Skeleton ICIT Proforma
C.1 Introduction
C.2 IXIT proforma
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.