API TR 934-G : 2016
Current
The latest, up-to-date edition.
DESIGN, FABRICATION, OPERATIONAL EFFECTS, INSPECTION, ASSESSMENT, AND REPAIR OF COKE DRUMS AND PERIPHERAL COMPONENTS IN DELAYED COKING UNITS
Hardcopy , PDF
English
20-04-2016
1 Scope
2 Normative References
3 Terms, Definitions, and Acronyms
4 Background
5 Design
6 Fabrication
7 Effects of Operating Practices on Drum Reliability
8 Inspection and Monitoring
9 Condition Assessment
10 Repairs
11 Peripheral Equipment
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.