Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ENA ER G5-4 : ISSUE 4 2001

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

PLANNING LEVELS FOR HARMONIC VOLTAGE DISTORTION & THE CONNECTION OF NON-LINEAR EQUIPMENT TO TRANSMISSION SYSTEMS & DISTRIBUTION NETWORKS IN THE UNITED KINGDOM

Superseded date

23-07-2013

Published date

12-01-2013

Gives the procedure for connecting single and three phase non-linear loads to PES supply networks. It contains connection limits in terms of plant loading for convertors and regulations, emission limits for Consumer's loads in terms of harmonic current, and total Harmonic Voltage Distortion planning limits for supply networks operating at 132 kV and below.

DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Superseded
SupersededBy

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more