AS/NZS 3500.3.2:1998
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
National plumbing and drainage Stormwater drainage - Acceptable solutions
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
29-05-2024
05-06-1998
SECTION 1 - SCOPE AND GENERAL 1.1 SCOPE AND APPLICATION 1.2 REFERENCED DOCUMENTS 1.3 DEFINITIONS 1.4 NOTATION 1.5 STORMWATER DRAINAGE INSTALLATION PLANS 1.6 IDENTIFICATION 1.7 PROTECTION OF WORKS 1.8 POSITION AND MANNER OF DISCHARGESECTION 2 - MATERIALS AND PRODUCTS 2.1 SCOPE OF SECTION 2.2 SELECTION AND USE 2.3 ROOF DRAINAGE SYSTEM 2.4 STORMWATER DRAINS (NON-PRESSURE) 2.5 RISING MAINS (PRESSURE) 2.6 SUBSOIL DRAINS 2.7 JOINTS 2.8 VALVES 2.9 CONCRETE AND MORTAR 2.10 EMBEDMENT MATERIAL 2.11 TRENCH FILL 2.12 MISCELLANEOUS 2.13 FILTERS FOR SUBSOIL DRAINS 2.14 RE-USESECTION 3 - ROOF DRAINAGE SYSTEMS - DESIGN 3.1 SCOPE OF SECTION 3.2 GENERAL METHOD 3.3 METEOROLOGICAL CRITERIA 3.4 CATCHMENT AREA 3.5 EAVES-GUTTER SYSTEMS 3.6 VALLEY GUTTERS 3.7 BOX GUTTER SYSTEMS 3.8 SOAKERSSECTION 4 - ROOF DRAINAGE SYSTEMS - INSTALLATIONS 4.1 SCOPE OF SECTION 4.2 TRANSPORT, HANDLING AND STORAGE 4.3 THERMAL VARIATION 4.4 CORROSION 4.5 INSTALLATION AND TESTING 4.6 INSPECTION AND CLEANING 4.7 ALTERATIONS AND DISCONNECTION 4.8 EAVES GUTTERS 4.9 BOX GUTTERS 4.10 VALLEY GUTTERS 4.11 DOWNPIPES 4.12 OVERFLOW DEVICES OR MEASURES 4.13 JOINTS FOR METAL COMPONENTS 4.14 JOINTS FOR PVC COMPONENTS 4.15 JOINTS FOR OTHER COMPONENTS 4.16 SUPPORT SYSTEMSSECTION 5 - SURFACE DRAINAGE SYSTEMS - DESIGN 5.1 SCOPE OF SECTION 5.2 DESIGN METHODS 5.3 LAYOUT 5.4 NOMINAL METHOD 5.5 GENERAL METHODSECTION 6 - SUBSOIL DRAINAGE SYSTEMS - DESIGN 6.1 SCOPE OF SECTION 6.2 PURPOSE 6.3 TYPES 6.4 LAYOUT 6.5 DESIGN CONSIDERATIONSSECTION 7 - SURFACE AND SUBSOIL DRAINAGE SYSTEMS - INSTALLATION 7.1 SCOPE OF SECTION 7.2 GENERAL REQUIREMENTS 7.3 SITE STORMWATER DRAINS 7.4 SUBSOIL DRAINSSECTION 8 - SURFACE AND SUBSOIL DRAINAGE SYSTEMS - ANCILLARIES 8.1 SCOPE OF SECTION 8.2 PAVED SURFACES 8.3 POINT(S) OF CONNECTION 8.4 REFLUX VALVES 8.5 INSPECTION OPENINGS 8.6 STORMWATER PITS, INLET PITS AND ARRESTERS 8.7 SURCHARGE OUTLETS 8.8 JUNCTIONS 8.9 JUMP-UPS 8.10 ANCHOR BLOCKS 8.11 ON-SITE STORMWATER DETENTION (OSD) SYSTEMSSECTION 9 - PUMPED SYSTEMS 9.1 SCOPE OF SECTION 9.2 GENERAL 9.3 WET WELLS 9.4 PUMPS 9.5 RISING MAINS 9.6 ELECTRICAL CONNECTIONSECTION 10 - TESTING 10.1 SCOPE OF SECTION 10.2 DOWNPIPES AND DRAINS WITHIN OR UNDER BUILDINGS 10.3 TEST CRITERIAAPPENDICESA - REFERENCED AND RELATED DOCUMENTSB - SITE MIXED CONCRETE FOR MINOR WORKSC - STORMWATER DRAINAGE INSTALLATION PLANSD - GUIDELINES FOR RAINFALL INTENSITIESE - RAINFALL INTENSITIES FOR AUSTRALIA - FIVE MINUTES DURATIONF - RAINFALL INTENSITIES FOR NEW ZEALAND - 10 MINUTES DURATIONG - EXAMPLES OF ACCEPTABLE OVERFLOW MEASURES FOR EAVES GUTTERSH - GENERAL METHOD FOR DESIGN OF EAVES GUTTER SYSTEMS - EXAMPLEI - BOX GUTTER SYSTEMS GENERAL METHOD, DESIGN GRAPHS AND ILLUSTRATIONSJ - BOX GUTTER SYSTEMS GENERAL METHOD, EXAMPLESK - SURFACE DRAINAGE SYSTEMS - NOMINAL AND GENERAL METHODS, EXAMPLESL - EXAMPLE CALCULATION - PUMPED SYSTEM
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.